Use Microsoft Planner when a team needs to assign work, set due dates, and follow progress. Choose the plan type from the work the team must manage.

Best For​

Use a basic Planner plan for team task boards, checklists, campaign work, small projects, and recurring operational tasks.

Choose A Basic Or Premium Plan​

Start with a basic plan when assignments, due dates, and a board give the team enough control. Consider a premium plan when the work needs dependencies, milestones, or a timeline. Features differ by plan type, and access to some features depends on the user's subscription. Check Microsoft's current basic and premium comparison before choosing or changing a plan.

Keep Tasks Connected To Their Work​

Keep the plan with the Team that owns the work. Agree who maintains the plan, reviews overdue tasks, and closes it when the work ends. If an item is mainly a record to maintain over time, keep it in Lists and create a Planner task for the action it requires.

Check Existing Connections

Before changing a basic plan to premium, check any apps or workflows that use it. Microsoft says connections built for basic plans may need changes.